Our Construction

HOME     Our Construction     Civil Engineering     Kyushu Shinkansen Kagoshima, No. 2 Underpass Bridge Bv

Kyushu Shinkansen Kagoshima, No. 2 Underpass Bridge Bv

Category
Bridges
Bridge Type, Construction Method, etc
Movable formwork construction method
Construction site
Fukuoka Prefecture
Completion date
2009

Name

Kyushu Shinkansen Kagoshima, No. 2 Underpass Bridge Bv

Ordered by Japan Railway Construction, Transport and Technology Agency
Awards Japan Prestressed Concrete Institute Award for Outstanding Accomplishments of Constructions
Construction site Fukuoka Prefecture
Completed 2009
Bridge length 700 m (out of 1080 m)
Effective width 11.2 m
Construction outline

4 key slab T-girder bridge + other simple T-girder bridge 

Because the site was in an urban area near a JR West Japan Hakata general rolling stock line and major trunk road, construction was carried out with due consideration for the surrounding environment.

Movable formwork construction was utilized for 20 spans.

Return to Our Construction

We use cookies to provide you with the best possible experience on our website. By continuing to use this website, you consent to the use of cookies. For more information, please see our Cookie Policy.