Kyushu Tsushin Network Co., Ltd. building construction

Category
Buildings
Bridge Type, Construction Method, etc
PCaPC method
Construction site
Fukuoka Prefecture
Completion date
October 2015

Construction type Precast PC method
Project name Kyushu Tsushin Network Co., Ltd. building construction
Ordered by The Zenitaka Corporation
Scope of work Precast prestressed structure Seismic isolation structure (pillar, beam, seismic isolation block, PC floor slab) assembly, pressure bonding
Construction site Shime Town, Kasuya District, Fukuoka Prefecture
Construction period May 30, 2014 - October 30, 2015
Construction outline

This project involved the construction in Shime Town of a building with four stories above ground plus a one-story penthouse.

Fuji P.S delivered the pillars, beams, seismic isolation blocks and PC floor slabs.

The members were manufactured at our Kotake plant and assembled on-site.

Assembly was performed using pressure bonding with PC steel members.

By using precast members manufactured in a plant, this saved on labor during construction and ensured the reliability of the finished product members.