Our Construction

HOME     Our Construction     Buildings     Katayama Park Housing Estate Bldg. C1, C4 seismic retrofitting and upgrade

Katayama Park Housing Estate Bldg. C1, C4 seismic retrofitting and upgrade

Category
Seismic Strengthening
Bridge Type, Construction Method, etc
Smile frame
Construction site
Osaka Prefecture
Completion date
February 2017

Construction type Smile parallel work (smile frame)
Project name Katayama Park Housing Estate Bldg. C1, C4 seismic retrofitting and upgrade
Ordered by Toda Corporation
Scope of work 11-Story SRC structure, two buildings, 482 units (smile frame-reinforcing 364-unit structural plane)
Construction site 34, Deguchi Town, Suita City, Osaka Prefecture
Construction period May 18, 2015 - February 18, 2017
Construction outline

This project involved seismic strengthening of a twin corridor-type high-rise housing complex ordered by Urban Renaissance Agency.

The order encompassed design and installation together; so, we worked together with Toda Corporation to come up with a design and then reached a decision on installation based on a comprehensive evaluation.

The reinforcing frame members were manufactured at our Mie plant and assembled on-site.

It is designed to widen the balcony where the reinforcing frame is attached, allowing plenty of usable space and being well-received by the residents.

 

 

 