HOME Our Construction Buildings 2016 Itazuke Municipal Housing 25-building seismic retrofitting
Construction type | Smile parallel work (smile damper frame) |
---|---|
Project name | 2016 Itazuke Municipal Housing 25-building seismic retrofitting |
Ordered by |
Mitoma Kensetsu Co., Ltd. |
Scope of work |
8-Story SRC structure (smile damper frame-reinforcing 29-unit structural plane) |
Construction site | 3-Chome, Itazuke, Hakata Ward, Fukuoka City |
Construction period | September 1, 2017 - March 30, 2018 |
Construction outline |
This project involved seismic strengthening work ordered by Fukuoka City via an open call for proposals. The design was carried out in conjunction with the Mitoma Kensetsu and Shibata & Associates Consortium and a decision on installation was reached based on a comprehensive evaluation. The reinforcing frame members were manufactured at our Kotake plant in Kyushu and assembled on-site. By installing the reinforcing frame on the corridor side, the living environment on the residential side (balcony side) remained unchanged, which was well received by residents. |