HOME Our Construction Civil Engineering Kakkaku Sazanami-ohashi Bridge
Name | Kakkaku Sazanami-ohashi Bridge |
---|---|
Ordered by | Saitama Prefecture |
Construction site | Saitama Prefecture |
Completed | 1997 |
Bridge length | 255 m |
Effective width | 7 m |
Construction outline |
2-span continuous cable-stayed bridge (cantilever erection) Full-scale, cantilever-erected PC cable-stayed bridge with two-sided suspension which was the largest cable-stayed bridge in Japan at the time of its construction. |