Our Construction

HOME     Our Construction     Civil Engineering     Minamichiku Bridge

Minamichiku Bridge

Category
Bridges
Bridge Type, Construction Method, etc
Extradosed bridges
Construction site
Fukuoka Prefecture
Completion date
2006

Name

Minamichiku Bridge
Ordered by Fukuoka Prefecture
Construction site Fukuoka Prefecture
Completed 2006
Bridge length 248 m
Effective width 19.75 m
Construction outline

3-span continuous extradosed 3-cell box-girder bridge (cantilever erection)

This bridge spans the Yabe River, a Grade-1 river, between Chikugo City and Setaka Town.

Envisioned as the eastern gateway to the Chikugo Regional Park, this bridge incorporates a conceptual design intended to blend with the camphor forests of the Yabe River.

Return to Our Construction

We use cookies to provide you with the best possible experience on our website. By continuing to use this website, you consent to the use of cookies. For more information, please see our Cookie Policy.