Tokyo International Airport Runway D (pier and connecting taxiway pier)

Category
Other Civil Engineering
Bridge Type, Construction Method, etc
PC pavement
Construction site
Tokyo
Completion date
2010

Name Tokyo International Airport Runway D (pier and connecting taxiway pier)
Ordered by Ministry of Land, Infrastructure, Transport and Tourism, Kanto Regional Development Bureau (Haneda Runway D Joint Construction Enterprise)
Construction site Tokyo
Completed 2010
Bridge length 115,800 m area
Construction outline Runway D is a hybrid structure comprised of landfill and pier, 2,500 m in length, 60 m in width and rising 13-17 m above sea level.
The pier structure is made using steel pipe piles, steel jacket, PC floor slabs and asphalt pavement.
The taxiway pier is a connecting taxiway pier joining the airport with runway D, and its superstructure is made using PC floor slabs.